Package 11 : Upgrading The Marine Traffic System of Hau rive for large vessels project

Description:

Package 11: Hau river and Quan Chanh Bo canal dredging package of upgrading the marine traffic system of Hau river for large vessels project
Upgrading the marine traffic system of Hau river for large vessels project is national dredging project in 2014-2015

Technical Information:

Dredging lenght : 31 Km
Width of Hau river : 95m -- Slope = 1/12m
Width of Quan Chanh Bo canal  : 85m -- Slope = 1/6 m
Construction time : 14 months
Depth -6.5m (CD level)
Dredging volume 6.880.654 m3


Location :

Don Xuan ward, Trà Cú district, Trà Vinh province
Dinh An ward, Trà Cú distric , Trà Vinh province
Long Vinh
 ward, Duyên Hải district , Trà Vinh province
Long Khanh ward, Duyên Hải district ,Trà Vinh province
 
 
 
 
 
 

© Copyright Khanh Giang Company | info@khanhgiang.com