Package 6B : Upgrading The Marine Traffic System of Hau river for large vessels project

Package 6B: Navigation chanel dredging and bank protection of Tat canal (km3+628 - Km8+175)  of upgrading the marine traffic system of Hau river for large vessels project.Upgrading the marine traffic system of Hau river for large vessels project is national dredging project in 2014-2015.          


Package 11 : Upgrading The Marine Traffic System of Hau river for large vessels project

Package 11: Hau river and Quan Chanh Bo canal dredging package of upgrading the marine traffic system of Hau river for large vessels projectUpgrading the marine traffic system of Hau river for large vessels project is national dredging project in 2014-2015.  


Soai Rap Navigation channel dredging project (Phase 2)

The project is intended to allow navigation for larger ships sailing to Ho Chi Minh city ports ( up to 50.000 DWT). It is an important project, serving Ho Chi Minh City's economic development and the relocation of ports along the Sai gon River towards the outer region.   Location : Soai Rap River, Long An, Can Gio and Ho Chi Minh City.


Chu Lai Open Economic Zone Infrastructure Construction Project

- Construction Sub-part of the Chu Lai Open Economic Zone Masterplan. Phase 1 in the contract to deepen waterways in order to enable 5000 ton container ships going from Ky Ha port to Tam Hiep Industrial Park, and exploit dredged sand to reclaim Tam Hiep Industrial Park.


My Thanh - Phu Huu Dyke construction in Soc Trang Province

- Build My Thanh - Phu huu dyke in Soc Trang Province to stabilize protection of residential areas: creating dike body, pumping sand and build rural road traffic.


Reclaiming Residential area at the rear end of Vinh Te Canal

 Package 5 of project which reclaim residential area at the end of Vinh Te canal.


Electricity - Gas - Fertilizer Plant Construction in Ca Mau

- Package 7.1 , sub-project of Electricity - Gas - Fertilizer Plant construction Project, to reclaim the plant's ground.  


Dau Tieng Irrigation System Improvement Project ( Package 1 )

- Package 1, from Kilometer 0 : Kilometer 21, in the Chinh Tay canal ,sub-Project of  the Dau Tieng irrigation system Improvement Project.


Left - Right of Cu Lao Dung Project ( Package 2 )

- Package 2 of project in order to restore and upgrade left side and right side of Cu Lao Dung in Soc Trang Province. In the first period: dredge the canal for river transportation access.


The MeKong Delta Infrastructure Development Project

Employer : Project " Nguyen Van Tiep Channel" is on Mekong Delta infrastructure development project.This sub project is to expand the Nguyen Van Tiep canal over 63.5 Km by dredging, carry out bank protection and frontage road. The channel is across Tien Giang and Dong Thap province.


© Copyright Khanh Giang Company | info@khanhgiang.com